~ Everybody Lives in a Watershed ~
Events Calendar
<< Sep 2010 >>
S M T W T F S
     
   

Pictures

Category OR Search
Prev Page 1 2 3 4 5 Next Page
The top end of the side-channel. It is fed by water that passes through the coanda screen and pip... The coanda screen and fish passage route shortly after construction. The coanda screen in operation. Some of the water that passes over the screen is directed into a ... An easier migration route around the coanda screen is created
DFO crews help Dig Dug (the machine operator) to backfill the coanda screen The coanda screen is installed, the intake pipe is attached to it, and the pipe is being covered ... Doug maneuvers the coanda screen into place The intake pipe to the side-channel is lifted out to make room for the coanda screen
Volunteers look on as machinery moves in to carry out work on the side-channel Bonzai! we got a fish! Marvin and Aiden gather young fish out of the creek and move them to a safe place away from const... A much needed rest break after hauling sand bags and moving plants! (July '09)